Pre-engineered buildings are ideal for different types of businesses. The manufacturers fabricate it in the factory and assemble it on site. While the erection process is challenging, any mistake can compromise the entire building structure. This is why you must hire professionals to erect the pre-engineered building in Arunachal Pradesh.

Steps to Erect the Pre-Engineered Building

  1. Prepare the Foundation

The first step to PEB steel building erection is executing the foundation. Most building providers will give you drawings and other information. It will include a detailed listing of the location, anchor bolts, and other components. The experienced foundation contractors will ensure the correct placement of the slab and anchor bolts. Once they do this step correctly, the erection of the building becomes easy.

  2. Primary Framing

The primary framing will have I-Beam rafters and columns during the PEB building construction. The experts weld the primary steel, pre-cut and pre-punch it for quick installation. They will take the strongest steel pieces, bolt them together to fasten to the foundation. Once they install the frame, they will start bolting the secondary members to the primary frame.

  3. Wall and Roof Sheeting

Next, the manufacturers will put up the insulation, wall and roof sheeting. This step is after completing the entire framing. They begin with the wall sheeting. Then they will attach the sheeting to the secondary frames using self-drilling fasteners. After doing the walls, they begin work on the roof panels. Finally, they will install the weather stripping. This is important since it will keep the building leakproof.

PEB Erection Mistakes to Avoid

  •   ● Not Getting Prior Approval

There are chances that the inspectors will refuse a permit for your PEB steel building construction. This is why taking prior approval is necessary. You should learn about the local building codes before ordering the kit. If the inspectors find it violating the rules, they will stall the construction process. So, make sure it fits the proper guidelines.

  •   ● Not Use a Proper Instruction Manual

You are likely to get an instruction manual with every PEB building kit. The stability and quality of the structure depend on several factors. It is necessary to follow the instruction kit to maximise efficiency. Every builder should follow a specific design and erection manual. Besides, they should be aware of the right erection techniques in detail.

  •   ● Ignoring Safety Measures 

You should follow proper safety measures while erecting the PEB building. Mistakes happen due to a lack of planning. Hence, everyone involved with the job should wear safety garments like gloves and hats.

Consult the experts at Unitech Structural Works for customised, prefabricated buildings. We are a reliable company that you can trust for robust PEB structures at affordable rates.