Peneng River Bridge
-
Bridge fabrication
Shop assembly of 50m long bridge.
-
Bridge fabrication
Submerged Arc Welding (SAW) for bridge girders.
-
Bridge fabrication
Fabrication work-in-progress – Splicing holes & Shear studds.
-
Bridge fabrication
Fabrication – Work – in- Progress.
-
Bridge fabrication
Full scale assembly and batch drilling for maximum accuracy while installing the girders.